Roads & Highways
Olive Street & Sample Street Intersection Improvement and Overpass Reconstruction
This is a cooperative project with the City of South Bend Department of Public Works and consists of roundabout construction, bridge deck replacement over railroad, sidewalks and street lighting. Construction was complete and road was opened to traffic in July 2017.
Consulting Engineers: DLZ (Design) and Lawson-Fisher & Associates (Construction)
Contractor: Rieth-Riley Construction
Pierce Road Rehabilitation - SR 331 to Ash Road
Design and Construction Engineering for this project was completed in-house by the St. Joseph County Department of Public Works staff and consists of milling out the existing asphalt pavement, placing a fiber road mat, longitudinal joint sealant, and asphalt pavement for this 5.75 mile stretch of roadway. Construction is currently finishing up and road shall be opened to traffic in August 2017.
Contractor: Walsh & Kelly
McKinley Highway & Ash Road Intersection Improvement
This is a cooperative project with the Elkhart County Redevelopment Commission and consists of widening for turn lanes and upgrading the existing traffic signal. Construction is currently underway, and should be complete in late 2017.
Consulting Engineers: DLZ (Design) and Troyer Group (Construction)
Contractor: HRP Construction
Brick Road & Fir Road Intersection Improvement
Project consists of constructing a new roundabout in place of the existing 4-way stop condition. Engineering design is nearing completion, and projected to be ready for construction in 2017.
Consulting Engineers: American StructurePoint (Design) and Abonmarche (Construction)
Contractor: Walsh & Kelly
Cleveland Road Reconstruction - Riverside Drive to SR 933
Project consists of reconstructing the existing pavement, bridge rehabilitation and deck replacement over St. Joseph River, and multi-use path construction. Engineering design is complete, and construction should begin in 2017 and be complete in 2018.
Consulting Engineers: Lochmueller Group (Design and Construction)
Contractor: TBD
Edison Road & Ash Road Intersection Improvement
Project consists of constructing a new roundabout in place of the existing 4-way stop condition. Engineering design is underway, and projected to be ready for construction in 2018.Consulting Engineers: CHA (Design) and TBD (Construction)
Contractor: TBD
Douglas Road Reconstruction - Ivy Road to SR 23
Project consists of improving the intersection of Douglas Road and Ironwood Road with widening for turn turn lanes and upgrading the existing traffic signal. The project also includes 2 bridge replacements over Juday Creek. There is also potential for complete corridor reconstruction with widening for added travel lanes from Ivy Road to SR 23 for added travel lanes. Preliminary engineering is underway, and projected to be ready for construction in 2020.
Consulting Engineers: DLZ (Design) and TBD (Construction)
Contractor: TBD
McKinley Highway Reconstruction - Birch Road to Ash Road
Project consists of widening for added travel lanes, turn lane and sidewalks. This is the final phase of McKinley Highway to be reconstructed from Capital Avenue to the Elkhart County Line. Engineering design is nearing completion, and projected to be ready for construction in 2022.
Consulting Engineers: DLZ (Design) and TBD (Construction)
Contractor: TBD